Commercial – Building Control Approval with Full Plans
*PLAN CHARGE TO BE PAID WITH APPLICATION
** INSPECTION CHARGE WILL BE INVOICED UPON STARTING WORK
Fees are inclusive of VAT (April 2024)
Table D - NON DOMESTIC EXTENSIONS AND NEW BUILD
TABLE D - NON DOMESTIC EXTENSIONS AND NEW BUILD BASEMENT – Additional Charge applies if the work includes a basement or partial basement storey
USE: Other Residential (Institution and Other)
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Floor area not exceeding 10m2 | £516.19 | £886.92 |
Floor area between 10m² and 40m² | £714.35 | £1,176.40 |
Floor area between 40m² and 100m² | £816.42 | £1,584.59 |
Floor area between 100m² and 200m² | £816.42 | £2,126.42 |
USE : Assembly and Recreational
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Floor area not exceeding 10m2 | £516.19 | £886.92 |
Floor area between 10m² and 40m² | £714.35 | £1,176.40 |
Floor area between 40m² and 100m² | £816.42 | £1,584.59 |
Floor area between 100m² and 200m² | £816.42 | £2,126.42 |
USE : Industrial and Storage
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Floor area not exceeding 10m2 | £640.15 | Included in Plan Charge |
Floor area between 10m² and 40m² | £434.20 | £586.36 |
Floor area between 40m² and 100m² | £513.97 | £747.76 |
Floor area between 100m² and 200m² | £616.05 | £886.92 |
USE : All Other Use Classes
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Floor area not exceeding 10m2 | £513.97 | £725.51 |
Floor area between 10m² and 40m² | £616.05 | £886.92 |
Floor area between 40m² and 100m² | £714.35 | £1,206.09 |
Floor area between 100m² and 200m² | £816.42 | £1,434.32 |
TABLE E - ALTERATIONS & WORK TO NON DOMESTIC
FIT OUT – OFFICE AND SHOP FIT OUT – OFFICE AND SHOP
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Floor area up to 500m2 | £434.20 | £616.05 |
Floor area between 500m2 and 1000m2 | £616.05 | £957.46 |
INSTALLATION OF MEZZANINE FLOOR (up to a floor area of 500m2)
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Fixed Price | £616.05 | £957.46 |
OTHER ALTERATIONS
Internal alterations, installation of fittings (not electrical) and/or, structural alterations (If ancillary to the building of the extension no additional charge)
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Estimated cost less than £5000 | £528.83 | Included in Plan Charge |
Estimated cost between £5,000 and £25,000 | £940.75 | Included in Plan Charge |
Estimated cost between £25,000 and 50,000 | £513.97 | £845.52 |
Estimated cost between £50,00 and £100,000 | £616.05 | £1,167.13 |
Estimated cost between £100,00 and £150,000 | £616.05 | £1,905.59 |
WINDOW REPLACEMENT & NEW SHOP FRONT(S) not competent persons scheme
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Per property up to 50 windows | £449.04 | Included in Plan Charge |
RENOVATION OF A THERMAL ELEMENT
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Estimated cost less than £50,000 | £560.35 | Included in Plan Charge |
Estimated cost between £50,00 and £100,000 | £313.56 | £356.26 |
Estimated cost between £100,00 and £250,000 | £415.63 | £486.13 |
UNDERPINNING
Description | Plan Charge* | Inspection Charge** |
---|---|---|
Underpinning | Please contact for a fee | Please contact for a fee |
Applications
Building Control Approval with Full Plans Application.
In this case, you as the building owner or your agent/architect will submit an application with plans showing full construction details and specification of the work together with any relevant structural calculations. A Building Control Surveyor will check the plans and specification for compliance. If items do not comply a list will be sent to the Agent for a response. An application can be Approved, Conditionally Approved or Rejected. Once construction commences a Building Control Surveyor will visit site to inspect the works. The fees are payable in 2 stages. The Plan fee must be paid with the application. Once work commences on site we will raise an invoice for the Inspection fee.
Building Notice Application.
A building notice can only be used for works to a dwelling. It is generally used for minor works such as removal of an internal load-bearing wall, and/or where the person carrying out the work is familiar with current building regulations. No plans or construction specifications are required, and any that are submitted will not be checked for compliance. Compliance is checked via the site inspections undertaken by the Building Control Surveyor, and they may request additional paperwork such as structural calculations and electrical certificates. One advantage is that it allows work to start 48 hours after submission of the
Regularisation Application.
This application is used for works that have already taken place illegally without the submission of a Full Plan or Building Notice application after November 1985. A Building Control Surveyor will inspect the works on site and usually ask for elements of the construction to be exposed. VAT is not applied to Regularisations.
Exemptions.
Some works may be exempt from the building regulations such as; new garages, conservatories and certain works to provide access or essential facilities for disabled people.
Estimated cost of work.
This should be based on an estimate of all reasonable costs including both material and labour, but excluding VAT, agent fees and decorating costs. A guide can be found from the RICS rates.
Floor Area
is measured by internally in m2
First Floor Extension.
(single storey structure above an existing single storey structure – i.e. an extension over an existing garage) Fee should be calculated by using the Single Storey extension table
Single Storey and Two Storey Extensions.
Please calculation the total floor area of all extensions and use the Two Storey Extension Table, providing that the works are carried out at the same time.
New Houses with floor area above 300m2 and/or more than 3 storeys.
Please contact the office for an Individually Determined Quote
Electrical Work.
An additional charge will apply when the electrical work is carried out by a person who is not a Part P registered electrician. A Part P registered electrician is a qualified electrician who also has the necessary building regulations knowledge to enable his/her accreditation body to certify his/her work. In order to recover the Local Authority costs, if anyone other than a Part P registered electrician undertakes the electrical work, an additional charge is payable.
Additional / Supplementary Charges.
The Standard Charges have been set on the basis that the design and building work is undertaken by a person or company that is experienced and competent to carry out the work. If not, the work may incur supplementary additional charges. Where plans and/or calculations have been checked and subsequent amendments or redesigns are submitted, the council reserves the right to make supplementary additional charges.